Issue |
E3S Web Conf.
Volume 252, 2021
2021 International Conference on Power Grid System and Green Energy (PGSGE 2021)
|
|
---|---|---|
Article Number | 03003 | |
Number of page(s) | 7 | |
Section | Energy Technology Research and Development and Green Energy-Saving Applications | |
DOI | https://doi.org/10.1051/e3sconf/202125203003 | |
Published online | 23 April 2021 |
Analysis of Block Orders and Its Implications for Market Participation Mode of Battery Energy Storage Stations
1 State Grid Corporation of China, Fujian Electric Power Trading Company Limited, 350000 Fuzhou, China
2 South China University of Technology, School of Electric Power, 510000 Guangzhou, China
* Corresponding author: epxzh@mail.scut.edu.cn
Flexible block orders designed by European electricity market is a relatively perfect time-sharing electricity price and clearing mechanism. It allows members to provide bidding form of diversification and individuation according to their own characteristics. This mechanism has features of flexibility, compatibility and expansibility, and can reasonably express the trading demands of various types of market participants, which including energy storage. Therefore, it can be used to solve the problem of market participation model of energy storage. Considering the actual situation in China, block orders are suitable for the daily, weekly and monthly markets to help battery energy storage stations. So that they can obtain low-price electric energy by participating in the medium and long-term electricity market and promote the development of them.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.