Issue |
E3S Web Conf.
Volume 248, 2021
2021 3rd International Conference on Civil Architecture and Energy Science (CAES 2021)
|
|
---|---|---|
Article Number | 03026 | |
Number of page(s) | 4 | |
Section | Research on Civil Water Conservancy Engineering and Urban Architecture | |
DOI | https://doi.org/10.1051/e3sconf/202124803026 | |
Published online | 12 April 2021 |
Problems and Countermeasures in the Budget Cost Control of Decoration Engineering
Architectural engineering institute, Jiangsu College of Engineering and Technology, Nantong, Jiangsu, China, 226002
With the rapid development of China's economy and technology, great progress has been made in all fields. Especially in the field of decoration engineering, great breakthroughs have also been made. The strength of enterprises continues to increase, and the gap between enterprises continues to narrow. In this context, how to strengthen the cost control of decoration enterprises and continuously improve their own strength has become an urgent problem. Based on this, this article carried out the budget analysis of the decoration project and analyzed the problems existing in the enterprise cost budget control. Finally, this paper proposes a series of measures such as unifying the cost budget specifications, continuously improving the project cost budget control system, and strengthening the project cost budget monitoring.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.