Open Access
Issue
E3S Web Conf.
Volume 248, 2021
2021 3rd International Conference on Civil Architecture and Energy Science (CAES 2021)
Article Number 03026
Number of page(s) 4
Section Research on Civil Water Conservancy Engineering and Urban Architecture
DOI https://doi.org/10.1051/e3sconf/202124803026
Published online 12 April 2021
  1. Zeng X.B. (2016). Discussion on the Budget Quotation Analysis and Cost Characteristics of Decoration Engineering, Modern Decor (Theoretical), 32 (3), 23–24. [Google Scholar]
  2. Zhang J., Zhang S.C. (2015). Thoughts on Cost Control of Expressway Bridge Engineering, Road Machinery & Construction Mechanization, 32 (2), 78–80. [Google Scholar]
  3. Hao X.X., Hao D.K. (2017). The Role of Construction Engineering Budget in Engineering Cost Control, Global Market, 24 (5), 185–185. [Google Scholar]
  4. Wang Q., Li L. (2019). Analysis of New Green Building Engineering Cost Budget and Cost Control, Building Materials and Decoration, 15 (16), 145–146. [Google Scholar]
  5. Ling S.H. (2016). The Importance of Construction Engineering Budget in Engineering Cost Control, Building Materials Development Guide, 38 (23), 250–251. [Google Scholar]
  6. Li G.Y., Li S.F. (2016). Discussion on the Role of Construction Engineering Budget in Engineering Cost Control, Global Market, 23 (14), 237–237. [Google Scholar]
  7. Yin J. (2017). Research on Pre-Settlement Audit of Building Decoration Engineering. Jiangxi Building Materials, 37 (5), 237–238. [Google Scholar]
  8. Tian Y. (2015). Control and Management of Budget and Final Accounts for Construction Engineering, Northern Economy and Trade, 35 (4), 188–189. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.