Issue |
E3S Web Conf.
Volume 292, 2021
2021 2nd International Conference on New Energy Technology and Industrial Development (NETID 2021)
|
|
---|---|---|
Article Number | 01016 | |
Number of page(s) | 5 | |
Section | Energy Storage Saving and New Energy Technology Development | |
DOI | https://doi.org/10.1051/e3sconf/202129201016 | |
Published online | 09 September 2021 |
Research on full cycle evaluation of power grid projects based on rough set-multilevel extension theory
1 State Grid Corporation Development Planning Department, 100031 Beijing, China
2 Tianjin Tianda Qiushi Electric Power New Technology, Co., Ltd., 300384 Tianjin, China
* Corresponding author: Yuhengsha@126.com
Project full-cycle evaluation is the process of evaluating the level of project implementation. The evaluation has a clear purpose orientation and involves the entire cycle of the project. This paper proposes a research method for the full-cycle evaluation of power grid projects based on rough set-multi-level extension theory. First, this article combines various aspects of the project to establish a project evaluation index system involving multiple interests such as the environment and society. Then, the index weight is determined based on the rough set theory, and the multi-level extension theory is used to evaluate the project in the whole cycle. This model provides new ideas for the accurate evaluation of various types of projects and lays a theoretical foundation for improving the level of project management.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.