Two-dimensional mathematical modeling of 2013 and 2020 Amur River floods
1 Water Problems Institute, Russian Academy of Sciences, Moscow, 119333, Russia
2 National Research University Moscow State University of Civil Engineering, Moscow, 129337 Russia
* Corresponding author: annaglotko@mail.ru
Predicting river flooding of the territory where people live and engage in economic activities is urgent. The most problematic area in the Russian Far East is the territory through which the Amur River and its tributaries flow. The article considers the calculations of two Amur River floods: 2013 – catastrophic flood and 2020 – low flood. The simulation was carried out using a system of two-dimensional Saint-Venant equations using the Stream 2D CUDA program. The solution of the system of equations by numerical methods is based on the original author’s methodology. Channel depth maps and WordDEMTM (Airbus Defense and Space, Intelligence) data at 24 m resolution were used as a digital elevation model. Calculations of river floods in 2013 and 2020 were performed on a built-in and calibrated mathematical model, which matches the observational data well.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.