Issue |
E3S Web of Conf.
Volume 410, 2023
XXVI International Scientific Conference “Construction the Formation of Living Environment” (FORM-2023)
|
|
---|---|---|
Article Number | 05023 | |
Number of page(s) | 10 | |
Section | Hydrotechnical Construction and Melioration | |
DOI | https://doi.org/10.1051/e3sconf/202341005023 | |
Published online | 09 August 2023 |
Design parameters of circular multidirectional spherical knife tools
Karshi Engineering - Economics Institute, Uzbekistan, 225, Mustakillik ave, 180100, Karshi, Uzbekistan
* Corresponding author: ismailov@qmii.uz
The aim of the research is to justify the design and geometric parameters of spherical blade working tools for preparing the soil for sowing gourds. The scheme of spherical knife working body is given. The basis of the working body is the thickness of the flange, the crevice of the spherical knife, the depth of treatment, the height of the knife element. Analytical dependences for determining the basic parameters of spherical knife working bodies are obtained. Theoretical researches show that for quality ripping of soil with minimal traction resistance the diameter of spherical blade working elements must be 400 mm, thickness of blade 15 mm, number of knives in blade must be 12 units. The length of the spherical blades is 110 mm.
Key words: Soil treatment methods / tillage / no-tillage / mini-till / no-till / resource saving / gourds / geometric dimensions / knife elements
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.