Time Cost Optimization of Assembly Building Installation Phase Based on Particle Swarm Optimization
Guangdong Technology College, Zhaoqing, Guangdong, China
* Corresponding author: 2278685325@qq.com
This paper combines the theory of resource-constrained project scheduling to analyze the cost influencing factors during the installation phase of prefabricated buildings, and establishes a resource-constrained scheduling model with the goal of minimizing the installation time to achieve the optimization of time cost during the installation phase.
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.