Issue |
E3S Web of Conf.
Volume 524, 2024
VII International Conference on Actual Problems of the Energy Complex and Environmental Protection (APEC-VII-2024)
|
|
---|---|---|
Article Number | 01019 | |
Number of page(s) | 7 | |
Section | Issues of the Energy Complex | |
DOI | https://doi.org/10.1051/e3sconf/202452401019 | |
Published online | 16 May 2024 |
Optimizing the operation of a high-voltage power line in Turkmenistan considering climatic conditions
1 State Energy Institute of Turkmenistan, 62, st. Bayramhan, Mary, 745400, Turkmenistan
2 Institute of Engineering, Technical and Transport Communications of Turkmenistan, 51, Senagat str., Ashgabat, 744400, Turkmenistan
* Corresponding author: amirhan31071989@mail.ru
This scientific article is devoted to the optimization of a 500 kV high-voltage power line, taking into account the climatic characteristics of Turkmenistan. As a result of the research, it was found that with a nominal line voltage of 500 kV under standard weather conditions, the load losses were 11.45 MW, the corona losses were 0.76 MW and the total power losses were 12.21 MW, in dry snow, corona losses amounted to 2.98 MW, and total power losses amounted to 14.43 MW; in rainy weather, corona losses amounted to 9.76 MW, total power losses amounted to 21.21 MW, and during frosts, corona losses amounted to 26.02 MW, total power losses amounted to 37.47 MW. For this reason, to reduce power losses in the line Mary PPS – Serdar 500 kV for P=0.2Pnat value, it is recommended to keep the voltage at 1.05 Unat in standard weather conditions, at Unat value in dry snow, and at 0.95Unat in rain and frost.
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.