Open Access
Issue
E3S Web Conf.
Volume 60, 2018
Ukrainian School of Mining Engineering
Article Number 00031
Number of page(s) 8
DOI https://doi.org/10.1051/e3sconf/20186000031
Published online 16 October 2018
  1. Golik, V., Komashchenko, V., & Morkun, V. (2015). Feasibility of using the mill tailings for preparation of self-hardening mixtures. Metallurgical and Mining Industry, (3), 38–41. [Google Scholar]
  2. Golik, V., Komashchenko, V., & Morkun, V. (2015). Innovative technologies of metal extraction from the ore processing mill tailings and their integrated use. Metallurgical and Mining Industry, (3), 49–52. [Google Scholar]
  3. O’Sullivan, D., & Newman, A. (2014). Extraction and Backfill Scheduling in a Complex Underground Mine. Interfaces, 44(2), 204–221. [CrossRef] [Google Scholar]
  4. Wang, Weijing, Huang, Shaofeng, Wu, Xiaobo, & Ma, Qingfei. (2011). Calculation and Management for Mining Loss and Dilution under 3D Visualization Technical Condition. Journal of Software Engineering and Applications, (4), 329–334. [Google Scholar]
  5. Rakishev, B.R. (2013). Complex usage of ore in the enterprises of non-ferrous metallurgy of Kazakhstan. Mining Journal, (7), 67–69. [Google Scholar]
  6. Sekisov, G.V., & Rasskazov, I.Y. (2014). Creation of a research and production mining and processing complexes for innovative supporting of mining industry. GIAB, (9), 113–121. [Google Scholar]
  7. Kantemirov, V.D. (2014). Technologic features of the development of new raw material bases. GIAB, (6), 369–373. [Google Scholar]
  8. Sokolov, I.V., & Smirnov, A.A. (2012). About the parameters for computation of ore reserves. Mining Journal, (4), 56–61. [Google Scholar]
  9. Vorobev, V.V. (1995). Efficiency of gaseous additives for explosive materials. In Proceedings of the 1st Ukrainian scientific conference “Industrial explosives and means of their initiation” (pp. 13–15). State Research Institute of Chemical Industry. [Google Scholar]
  10. Komir, V.M., Vorobiev, V.V., & Napadaylo, V.I. (1991). The effect of gas-forming additive substances in the explosive material on the effectiveness of rock destruction. Blasting work, 90/47. Moscow: Nedra. [Google Scholar]
  11. Haifeng, W., Yaqun, H., Chenlong, D., Yuemin, Z., Youjun, T., & Cuiling, Y. (2012). Development of Mineral Processing Engineering Education in China University of Mining and Technology. Advances in Computer Science and Engineering. AISC 141. Springer-Verlag, Berlin Heidelberg, 77–83. [Google Scholar]
  12. Bakhtavar, E., & Shahriar, K. (2007). Optimal ultimate pit depth considering an underground alternative. In Proceedings of Fourth Aachen International Mining Symposia-High Performance Mine Production (pp. 213–221). Aachen, Germany. [Google Scholar]
  13. Capilla, A., & Delgado, A. (2015). The destiny of the Earth’s mineral resources. London: World Scientific Publishing Co. Pte. Ltd. [Google Scholar]
  14. Benardos, A., Athanasiadis, I., & Katsoulakos, N. (2014). Modern earth sheltered constructions: A paradigm of green engineering. Tunnelling and Underground Space Technology, (41), 46–52. [Google Scholar]
  15. Bowman, S. (2016). Interferometric Synthetic Aperture Radar (InSAR). Back-ground and Application: guidelines for in-vestigating geologic hazards and preparing engineering geology reports, with a suggested approach to geologic-hazard ordinances in Utah. The University of Utah, 198–203. [Google Scholar]
  16. Morkun, V., Tron, V., & Goncharov, S. (2015). Automation of the ore varieties recognition process in the technological process streams based on the dynamic effects of high-energy ultrasound. Metallurgical and Mining Industry, (2), 31–34. [Google Scholar]
  17. Morkun, V., Morkun, N., & Pikilnyak, A. (2015). The study of volume ultrasonic waves propagation in the gas-containing iron ore pulp. Ultrasonics, (56), 340–343. [CrossRef] [PubMed] [Google Scholar]
  18. Morkun, V., & Tron, V. (2014) Ore preparation energy-efficient automated control multi-criteria formation with considering of ecological and economic factors. Metallurgical and Mining Industry, (5), 8–10. [Google Scholar]
  19. Morkun, V., & Tcvirkun, S. (2014). Investigation of methods of fuzzy clustering for determining ore types. Metallurgical and Mining Industry, (5), 11–14. [Google Scholar]
  20. Morkun, V., Morkun, N., & Pikilnyak, A. (2014). The gas bubble size distribution control formation in the flotation process. Metallurgical and Mining Industry, (4), 42–45. [Google Scholar]
  21. Morkun, V., Morkun, N., Pikilnyak, A. (2014). Ultrasonic facilities for the ground materials characteristics control. Metallurgical and Mining Industry, (2), 31–35. [Google Scholar]
  22. Morkun, V., Morkun, N., Pikilnyak, A. (2014). Iron ore flotation process control and optimization using high-energy ultrasound. Metallurgical and Mining Industry, (2), 36–42. [Google Scholar]
  23. Morkun, V., Morkun, N., & Pikilnyak, A. (2014). Modeling of ultrasonic waves propagation in inhomogeneous medium using fibered spaces method (k-space). Metallurgical and Mining Industry, (2), 43–48. [Google Scholar]
  24. Morkun, V., Morkun, N., & Pikilnyak, A. (2014). Simulation of the Lamb waves propagation on the plate which contacts with gas containing iron ore pulp in Waveform Revealer toolbox. Metallurgical and Mining Industry, (5), 16–19. [Google Scholar]
  25. Morkun, V., Morkun, N., & Tron, V. (2015). Formalization and frequency analysis of robust control of ore beneficiation technological processes under parametric uncertainty. Metallurgical and Mining Industry, (5), 7–11. [Google Scholar]
  26. Morkun, V, Semerikov S., & Hryshchenko, S. (2014). Environmental competency of future mining engineers. Metallurgical and Mining Industry, (4), 4–7. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.