Open Access
Issue
E3S Web Conf.
Volume 109, 2019
International Conference Essays of Mining Science and Practice
Article Number 00084
Number of page(s) 10
DOI https://doi.org/10.1051/e3sconf/201910900084
Published online 09 July 2019
  1. Kazikayev, D.M., Sergeyev, S.V. (2011). Diagnostika i monitoring napryazhennogo sostoyaniya krepi vertikal’nykh stvolov. Moskva: Gornaya kniga [Google Scholar]
  2. Zhukov, A.A. (2016). Development and adaptation of the technology of diagnostics of concrete lining of the mine shafts of potash mines. Gornyu informatsionnoanaliticheskiy byulleten [Mining informational and analytical bulletin], (8), 245-254 [Google Scholar]
  3. Stupnik, N.I., Fedko, M.B., Pismenny, S.V., Kolosov, V.A. (2014). Development of recommendations on the choice of mounting mine workings and interfaces in the conditions of uranium mines of the SE “VostGOK”. Naukovyy visnyk Natsionalnoho hirnychoho universytetu, (5), 21-25 [Google Scholar]
  4. Svod pravil SP 41.13330.2012. (2012). Betonnyye i zhelezobetonnyye konstruktsii gidrotekhnicheskikh sooruzheniy. Moskva: FAU “FTSS” [Google Scholar]
  5. Nabatov, V.V., Voznesensky, A.S. (2015). GPR detection of cavities in the postprocessing space of underground tunnels. Gornyy zhurnal, (2), 15-20 [Google Scholar]
  6. Baryshnikov, V. D. Khmelinin, A.P., Denisova, E.V. (2014). Detection of Inhomogeneities in Concrete Lining of Underground Excavations Using GeoRadar Method. Journal of Mining Science., (1), 25-32 [CrossRef] [Google Scholar]
  7. De la Haza, A., Samokrutov A.A., Shevaldykin V.G. (2015). Diagnostics of reinforced concrete walls of the tunnel using an ultrasound tomography. V mire nerazrushayushchego kontrolya, (2), 36-39 [Google Scholar]
  8. Kozlov, A.V., Kozlov, V.N. (2015). Development and current state of the methods of non-destructive testing and acoustic tomography of concrete. Defektoskopiya, (6), 3-4 [Google Scholar]
  9. Skipochka, S.I., Sergienko, V.N. (2015). Monitoring the condition of ring-shaped concrete lining of mine shafts. Metallurgicheskaya i gornorudnaya promyshlennost, (5), 80-84 [Google Scholar]
  10. Voznesensky, A.S., Voznesensky, E.A., Koryakin, V.V., Krasilov, M.N. (2015). Principles of construction and prospects for the development of rock mass monitoring devices and anchorage around workings. Gornyu informatsionno-analiticheskiy byulleten [Mining informational and analytical bulletin], (1), 199-206 [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.