Open Access
Issue |
E3S Web Conf.
Volume 136, 2019
2019 International Conference on Building Energy Conservation, Thermal Safety and Environmental Pollution Control (ICBTE 2019)
|
|
---|---|---|
Article Number | 04020 | |
Number of page(s) | 3 | |
Section | Urban Public Safety | |
DOI | https://doi.org/10.1051/e3sconf/201913604020 | |
Published online | 10 December 2019 |
- Peng Z.X. (2019) Construction Technology of CRD Method in Construction of Large Section Shallow Buried Bias Tunnel[J]. Journal of Highway and Transportation Technology (Applied Technology Edition), 15(03):164-165+197. [Google Scholar]
- Song Z.P., Zhang Q., Zhao K.M., Zhang X.G., Zhang X.W., Wang J.J. (2018) Study on the advance construction optimization of tunnel double-conducting tunnel based on on-site monitoring and numerical analysis[J]. Journal of Xi’an University of Architecture & Technology(Natural Science Edition), 50(05): 654-661. [Google Scholar]
- Fu H.L., Yuan L., Deng X.W. (2018) Study on excavation method of shallow buried tunnel in surrounding rock[J]. Journal of Railway Science and Engineering, 15(10):2583-2589. [Google Scholar]
- Li G.H., Yu X.B., Ma L., Liu C. (2018) Study on the deformation law of surrounding rock under the influence of CRD construction of large section highway tunnel[J]. Journal of Highway and Transportation Technology, 34(S1): 70-75. [Google Scholar]
- Zhou B.S. (2018) Optimization of Construction Technology of Super Shallow Buried Tunneling by CRD Method[J]. Modern Tunnel Technology, 55(04):186-190. [Google Scholar]
- Wei G., Yao W.J., Xu B., Shi C. J., Fu Y., Wang Z. (2018) Analysis of the settlement of the vault of large-section tunnel with shallow excavation in soft soil area[J]. Tunnel Construction (Chinese and English), 38(07): 1123-1130. [Google Scholar]
- Gao B., Qian Y.C., Zhu X.J., Dong W.B. (2018) Application of Improved CRD Method in the Construction of Underground Tunnels in Wuhan Three-Level Terrace[J]. Railway Construction, 58(07):76-79. [Google Scholar]
- Yao H.W., Wang W. (2018) Optimization of CRD method and field test of shallow buried tunnel[J]. Journal of Railway Science and Engineering, 15(06): 1509-1515. [Google Scholar]
- Wang C.H., Zhang A.J., Fan X.F., Li Y.P., Niu J.P., Zeng Z.N., Sun G.T. (2018) Numerical experimental study on surrounding rock control mechanism of super-large section tunnel under upper and lower step method and CRD method[J].Highway, 63(05):313-317. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.