Open Access
Issue
E3S Web Conf.
Volume 136, 2019
2019 International Conference on Building Energy Conservation, Thermal Safety and Environmental Pollution Control (ICBTE 2019)
Article Number 04041
Number of page(s) 3
Section Urban Public Safety
DOI https://doi.org/10.1051/e3sconf/201913604041
Published online 10 December 2019
  1. Xiaoming Li. (2011) Development and Application of Key Technologies of Fabricated Concrete Structure in Foreign Countries J. Housing Industry, 6: 16-18. [Google Scholar]
  2. Taichang Gu. (2014) The Current Situation of Prefabricated Buildings at Home and Abroad J Standardization of Engineering Construction, 8: 48-51. [Google Scholar]
  3. Jianguo Cai, Feng Jian. Zan Wang. (2009) Seismic Performance of Precast Prestressed Concrete Assembly Integral Frame J. Journal of Sun Yat-Sen University (natural science edition), 48 (2): 136-140. [Google Scholar]
  4. Zhi Dong. (2017) Study on Seismic Behavior of Prefabricated Beam-column Connection Joints with Anchor Reinforcement at Beam End and Bottom D. Nanjing: Southeast University. [Google Scholar]
  5. Bin Zhao, Xilin Lv, Lizhen Liu. (2005) Experimental Study on Seismic Behavior of Beams and Columns of Fully Fabricated Precast Concrete Structures J. Earthquake Engineering and Engineering Vibration, 25 (1): 81-87. [Google Scholar]
  6. Gang Wu, De Chengfeng. (2018) Research on Basic Performance of Fabricated Concrete Frame Joints J. Journal of Architectural Structure, 39 (02): 1-16. [Google Scholar]
  7. Xiaoyan Yv, Huajiang. (2019) Research on Node Design of New Type Fabricated Concrete Frame Structure J. Shandong Industrial Technology (07): 111+100. [Google Scholar]
  8. Feifei Liu, Dehu Yv, Jigang Zhang. (2015) Design and Analysis of New Joints of Fabricated Concrete Frame Structure J. Journal of Qingdao University of Technology, 36(01): 118-124. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.