Open Access
Issue
E3S Web Conf.
Volume 168, 2020
II International Conference Essays of Mining Science and Practice
Article Number 00017
Number of page(s) 9
DOI https://doi.org/10.1051/e3sconf/202016800017
Published online 06 May 2020
  1. Varnakov, Yu.V. (2012). Analysis of existing emulsion explosives of class 2, designed for blasting with small diameter boreholes. Bulletin of the Scientific Center for the Safety of Work in the Coal Industry, (1), 22-24 [Google Scholar]
  2. Tambiev, P.G. (2013). The concept of creating emulsion explosives in SPE “Interrin” LLP Bulletin of the Scientific Center for the Safety of Work in the Coal Industry, (3), 1417 [Google Scholar]
  3. Tambiev, P.G. (2013). Granular explosives of the Igdarin brand for underground mining. Bulletin of the Scientific Center for the Safety of Work in the Coal Industry, (5), 18-23 [Google Scholar]
  4. Internet recourse: www.vibromaster.ru [Google Scholar]
  5. Dobrynin, I.A. (2017). New Porous Saltpeter of Eurochem Company. Mining Information and Analytical Bulletin, (9), 15-19 [Google Scholar]
  6. Saprykin, I.Ye., Fedotenko, S.M., Grishin, S.V. (2007). Optimization of blasting operations at open pits of the coal companies “Kuzbassrazrezugol”. Gornyi Zhurnal, (6), 14-18 [Google Scholar]
  7. Fedorov, S.A. (1964). Air gaps as a way to control the action of an explosion. Collection. ”Vzryvnoe delo”, 54(11), 220-221 [Google Scholar]
  8. Lavrov, G.M., Grigoryev, A.V. (1986). On one of the methods of fixing charges in the well. Collection. “Vzryvnoe delo”, 89(46), 123-124 [Google Scholar]
  9. Kantor, V.Kh. (1964). Development of new designs of borehole explosive charges and methods for their formation. Collection. “Vzryvnoe delo”, 97(54), 220-222 [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.