Open Access
Issue
E3S Web Conf.
Volume 198, 2020
2020 10th Chinese Geosynthetics Conference & International Symposium on Civil Engineering and Geosynthetics (ISCEG 2020)
Article Number 02023
Number of page(s) 7
Section Structural Engineering Monitoring, Control, Repair and Reinforcement
DOI https://doi.org/10.1051/e3sconf/202019802023
Published online 26 October 2020
  1. Liu, Y.S. (2008) Construction Project Management. Beijing Institute of Technology Press, Bei jing. [Google Scholar]
  2. MU, Y.Y.(2015) Risk Management of Construction Project Based on the Engineering Construction Contract of NEC. D. Hebei University of Engineering, Hebei. [Google Scholar]
  3. Guo, H.F.(2019) Rearch on Analysis and Prevention of international engineering construction risk. J. Yunnan Science and Technology Management, 02: 58-60. [Google Scholar]
  4. HE, T. (2003) Analysis and Research on construction risk of international engineering project. J. Construction Technology, 12: 26-28. [Google Scholar]
  5. Ding, M.J.(2017) Rearch on Risk Management of General Construction Contractors in International Projects. D. Tianjin University. Tianjin. [Google Scholar]
  6. Wang, J.D.(2006) Rearch on Risk Management of the Contractors in the International Construction Project. D. Dalian University of Technology, Dalian. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.