Open Access
Issue
E3S Web Conf.
Volume 218, 2020
2020 International Symposium on Energy, Environmental Science and Engineering (ISEESE 2020)
Article Number 01010
Number of page(s) 4
Section Research on Energy Technology Application and Consumption Structure
DOI https://doi.org/10.1051/e3sconf/202021801010
Published online 11 December 2020
  1. Wang, L, Peng, D.X., Wu, H.L. (2020) Research on the evaluation system of power grid enterprise investment management and control in the whole process-multi attribute decision analysis based on binary semantics. Price theory and practice, (05): 106-109. [Google Scholar]
  2. Ji, X.J., Wang, Y.Q. (2018) Investment risk assessment and coping strategies of power grid companies under the background of power reform. Power grid and clean energy, 34 (05): 6-12. [Google Scholar]
  3. Zhang, D.E. (2018) Suggestions on the whole process control of power grid construction project investment. Modern economic information, (23): 313+315. [Google Scholar]
  4. Yang, L. (2015) Research on the post evaluation system of the whole process of power grid investment projects. Science and technology and enterprises, (14): 27. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.