Open Access
Issue |
E3S Web Conf.
Volume 253, 2021
2021 International Conference on Environmental and Engineering Management (EEM 2021)
|
|
---|---|---|
Article Number | 02045 | |
Number of page(s) | 4 | |
Section | Big Data Environment Management Application and Industry Research | |
DOI | https://doi.org/10.1051/e3sconf/202125302045 | |
Published online | 06 May 2021 |
- R. X. Wei and Y. H. Tang. Management of equipment cost. Beijing: National Defense Industry press, 2004. [Google Scholar]
- T. Y. Lv, and M. Z. Wu, “Explore and analyze the way of optimizing equipment cost of American army,” Military Economic Research, pp. 51–52, March 2010. [Google Scholar]
- B. Tian. A Study on Structure Optimization Methods for Military Spendings. Wuhan: Naval University of Engineering, 2008. [Google Scholar]
- H. Y. Gao. Western economics (microscopic part). Beijing: Renmin University of China press, 2004. [Google Scholar]
- E. Smyani, S. C. Chou, and C. H. Chen, “Rir passenger demand forecasting and passenger of electronic capacity expansion: a system dynamics frame work,” Expert Systems with Applications, vol. 37, pp. 2324–2339, March 2010. [Google Scholar]
- Y. G. Zhong, X. J. Jia, and X. Li. System Dynamics. Beijing: Science press, 2009. [Google Scholar]
- F. Luo, X. M. Luo, and S. Y. Zhang, “Application of systemics’ model on control of fife cycle cost of weapon and equipment,” Journal of the Academy of Equipment Command & Technology, vol. 16, pp. 16–20, February 2005. [Google Scholar]
- D. Zhang, F. Luo, and X. M. Luo, “The macroscopical controlof the life cycle cost of the equipments based on system dynamics’ model,” Journal of National University of Defense Technology, vol. 27, pp. 110–114, March 2005. [Google Scholar]
- S. Y. Zhang, Q. B. Guan, and S. X. Feng, “Simulation of equipment LCC control based on SD,” Computer Simulation, vol. 23, pp. 11–13, July 2006. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.