Open Access
Issue
E3S Web Conf.
Volume 315, 2021
VIth International Innovative Mining Symposium
Article Number 03020
Number of page(s) 9
Section Innovations in Mining Machinery
DOI https://doi.org/10.1051/e3sconf/202131503020
Published online 28 October 2021
  1. S.L. Chen, Three-dimensional analysis of earth pressure balance (EPB) shield tunneling in soft bedrock (CSM, Vancouver, 2018) [Google Scholar]
  2. B. Dziuban, H.I. Ling, L. Li, Transp. Infrastructure. Geotech. 5, 318 (2019) [Google Scholar]
  3. C.J. Lee, Y.J. Jeon, S.H. Kim, I.J. Park, Geom. and Eng. J. 11(4), 553 (2016) [Google Scholar]
  4. R.A. Raid, S.A. Madhat, I.A. Osamah, Studia Geot. Mech. 41(2), 102 (2019) [CrossRef] [Google Scholar]
  5. A.Z. Waad, A.M. Qasim, H.M. Halah, J. of Eng. Sci. 12(4), 50 (2019) [Google Scholar]
  6. A.B. Efremenkov, IFOST-2011, 2(1), 348 (2011) [Google Scholar]
  7. A.A. Kazantsev, V.P. Kosykh, A.F. Revuzhenko, IOP Conference Series: Materials Science and Engineering, 91, 012089 (2015) [CrossRef] [Google Scholar]
  8. M.Y. Blashchuk, A.A. Kazantsev, R.V. Chernukhin, Appl. Mech. Mater. 682, 418 (2014) [CrossRef] [Google Scholar]
  9. A.A. Khoreshok, P.V. Buyankin, A.V. Vorobiev, A.A. Dronov, IOP Conference Series: Materials Science and Engineering, 127, 012014 (2016) [CrossRef] [Google Scholar]
  10. S. Nishi, T. Seiki, Mem. Sch. Eng. Nagoya Univ., 1, 34 (1997) [Google Scholar]
  11. B. Maidl, L. Schmid, W. Ritz, M. Herrenknecht, Hardrock Tunnel Boring Machines (Ernst&Sohn, Berlin, 2008) [CrossRef] [Google Scholar]
  12. A. A. Khoreshok, L. E. Mametev, A.Yu. Borisov, A. V. Vorobev, Applied Mechanics and Materials, 770, 434 (2015) [Google Scholar]
  13. A. Khoreshok, K. Ananyev, A. Ermakov, E. Golikova, E3S Web Conf. 105, 03010 (2019) [CrossRef] [EDP Sciences] [Google Scholar]
  14. A. Khoreshok, K. Ananyev, A. Ermakov, A. Babarykin, E3S Web Conf. 105, 03007 (2019) [CrossRef] [EDP Sciences] [Google Scholar]
  15. A. Khoreshok, L. Mametyev, A. Borisov, A. Vorobiev, Stress-deformed state knots fastening of a disk tool on the crowns of roadheaders. Mining 2014. Taishan academic forum - project on mine disaster prevention and control. Chinese coal in the XXI century: Mining, green and safety. Qingdao, China, October 17–20, 2014 (Atlantis press, Amsterdam-Paris-Beijing, 2014) [Google Scholar]
  16. V.Yu. Timofeev, V.Yu.Beglyakov, M.V. Dokhnenko, Applied Mechanics and Materials, 682, 282 (2014) [CrossRef] [Google Scholar]
  17. A. Khoreshok, K. Ananiev, A. Ermakov, A. Babarykin, D. Kuziev, Acta Montanistica Slovaca, 25(1), 70 (2020) [Google Scholar]
  18. V. Kuznetsov, E. Preis, K. Ananyev, A. Ermakov, Determination of contact temperature on cutting disc during rock destruction, E3S WEB OF CONFERENCES. Vth International Innovative Mining Symposium. T.F. Gorbachev Kuzbass State Technical University, 03005 (2020) [Google Scholar]
  19. V. Nesterov, V. Aksenov, V. Sadovets, D. Pashkov, E3S Web Conf. 174, 03011 (2020) [CrossRef] [EDP Sciences] [Google Scholar]
  20. V. Aksenov, V. Sadovets, D. Pashkov, E3S Web Conf. 41, 03002 (2018) [CrossRef] [EDP Sciences] [Google Scholar]
  21. V.V. Aksenov, A.B. Efremenkov, V.Y. Sadovets, D.А. Pashkov, V.A. Efremenkov, IOP Conference Series: Materials Science and Engineering, 939, 012003 (2020) [CrossRef] [Google Scholar]
  22. V.V. Aksenov, A.B. Efremenkov, V.Y. Sadovets, D.А. Pashkov, V.A. Efremenkov, IOP Conference Series: Materials Science and Engineering, 656, 012002 (2019) [CrossRef] [Google Scholar]
  23. V. Nesterov, V. Aksenov, V. Sadovets, D. Pashkov, E3S Web Conf. 105, 03001 (2019) [CrossRef] [EDP Sciences] [Google Scholar]
  24. V.V. Aksenov, A.B. Efremenkov, V.Y. Sadovets, D.А. Pashkov, IOP Conference Series: Materials Science and Engineering, 441, 012005 (2018) [CrossRef] [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.