Open Access
Issue |
E3S Web Conf.
Volume 320, 2021
Energy Systems Environmental Impacts (ESEI 2021)
|
|
---|---|---|
Article Number | 03001 | |
Number of page(s) | 10 | |
Section | Data Accuracy Analysis | |
DOI | https://doi.org/10.1051/e3sconf/202132003001 | |
Published online | 09 November 2021 |
- V.S. Ptitsyna, M.S. Kulikova, V.A. Vasiliev and S.A. Chernogorskiy, The Introduction of Information Technology in Business Processes as a Method of Quality Improvement, vol. 666, 2019, doi:10.1088/1757-899X/666/1/012059. [Google Scholar]
- A. Mittal, and P. Gupta. “An Empirical Study on Enhancing Product Quality and Customer Satisfaction using Quality Assurance Approach in an Indian Manufacturing Industry.” Internaional Journal of Mathematical, Engineering and Management Sciences, vol. 6, no. 3, 2021, pP. 878-893, doi:10.33889/ijmems.2021.6.3.052. [Google Scholar]
- R. Wolniak, “The Concept of Operation and Production Control.” Production Engineering Archives, vol. 27, no. 2, 2021, pP. 100-107, doi:10.30657/pea.2021.27.12 [CrossRef] [Google Scholar]
- S. Sabirova, V. A. Vasiliev, and S. A. Chernogorskiy. Choosing a Quality Management Method, vol. 666, 2019, doi:10.1088/1757-899X/666/1/012043. [Google Scholar]
- L. Sang, et al. “Big Data, Technology Capability and Construction Project Quality: A Cross-Level Investigation.” Engineering, Construction and Architectural Management, vol. 28, no. 3, 2021, pP. 706-727, doi:10.1108/ECAM-02-2020-0135. [CrossRef] [Google Scholar]
- Y. V. Velmakina, V. A. Vasiliev, and S. A. Chernogorskiy. Methodology for Assessing the Performance of the Integrated Management System, vol. 666, 2019, doi:10.1088/1757-899X/666/1/012042. [Google Scholar]
- G.A. Stroykov, N.V. Babyr, I.V. Ilin, R.S. Marchenko, “System of Comprehensive Assessment of Project Risks in Energy Industry.” International Journal of Engineering, Transactions A: Basics, vol. 34, no. 7, 2021, pP. 1778-1784, doi:10.5829/IJE.2021.34.07A.22. [Google Scholar]
- R. Trishch, et al. “Methodology for Multi-Criteria Assessment of Working Conditions as an Object of Qualimetry.” Engineering Management in Production and Services, vol. 13, no. 2, 2021, pP. 107-114, doi:10.2478/emj-2021-0016. [CrossRef] [Google Scholar]
- M. Almasi, S. Khoshfetrat, and M. R. Galankashi. “Sustainable Supplier Selection and Order Allocation Under Risk and Inflation Condition.” IEEE Transactions on Engineering Management, vol. 68, no. 3, 2021, pP. 823-837, doi:10.1109/TEM.2019.2903176. [CrossRef] [Google Scholar]
- T. Adreeva, et al. “Development of Lean Manufacturing in Quality Management System.” Quality Access to Success, vol. 22, no. 181, 2021, pP. 71-75. [Google Scholar]
- P. Dionysopoulou, G. Svarnias, and T. Papailias. “Total Quality Management in Public Sector, Case Study: Customs Service.” Regional Science Inquiry, vol. 13, no. 1, 2021, pP. 153-168. [Google Scholar]
- I. Gremyr, et al. “Increasing the Value of Quality Management Systems.” International Journal of Quality and Service Sciences, 2021, doi:10.1108/IJQSS-10-2020-0170. [Google Scholar]
- P. Ondra, “Managing Quality in Industrial Companies: The Empirical Study of Quality Management Systems in the Czech Republic.” Serbian Journal of Management, vol. 16, no. 1, 2021, pP. 251-266, doi:10.5937/sjm16-24507. [CrossRef] [Google Scholar]
- R. Trishch, et al. “Methodology for Multi-Criteria Assessment of Working Conditions as an Object of Qualimetry.” Engineering Management in Production and Services, vol. 13, no. 2, 2021, pP. 107-114, doi:10.2478/emj-2021-0016. [CrossRef] [Google Scholar]
- A. O. Verenikin, F. S. Amirkhanova, and A. Y. Verenikina. Quality Management System Certification in the Russian Software Development Industry, 2021, doi:10.1109/ICITM52822.2021.00011. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.