Open Access
Issue |
E3S Web of Conf.
Volume 401, 2023
V International Scientific Conference “Construction Mechanics, Hydraulics and Water Resources Engineering” (CONMECHYDRO - 2023)
|
|
---|---|---|
Article Number | 03035 | |
Number of page(s) | 9 | |
Section | Road Construction, Building Structures and Materials | |
DOI | https://doi.org/10.1051/e3sconf/202340103035 | |
Published online | 11 July 2023 |
- Zernant A.A. Methodological bases of creating technologies of the third millennium for transport construction. Proceedings of the Central Research Institute of the Russian Academy of Sciences. 2000, no. 203, pp. 17-27. [Google Scholar]
- Pryamitsyn A.A. Structural and technological solutions of contact network support structures, providing increase of their durability. Cand. of Sci. of Technology: 05.23.07 Moscow, 2003, 184 p. [Google Scholar]
- VSN 447-N Departmental technical guidelines for the design of the contact network of high-speed railroads. SJC “UTY”, Tashkent, 2010. [Google Scholar]
- KMK 2.03.05-97 Steel structures. Design Norms Approved by Goskomarhitektstroy RUz. from 06.11.96 №104. [Google Scholar]
- KMK 2.03.01-97 Concrete and reinforced concrete structures. Approved by the State Committee for Mining and Architecture of the Republic of Uzbekistan 11.09.97 №87. [Google Scholar]
- VSN 446-N Departmental technical guidelines for construction and installation works during electrification of high-speed railroads (contact network devices). SJC “UTY”. Tashkent, 2010. [Google Scholar]
- Technological charts for works in maintenance and repair of contact net devices of electrified railroads. Book 1. Capital repair. Moscow: Ministry of Railways of Russian Federation, 1997, 524 pp. [Google Scholar]
- Zernant A.A., Schmidt V.I. Scientific support as an element of the quality system in bridge engineering. Bulletin of Russian Academy of Transport (PAT). Department of Transport Construction. 2001, vol. 2, pp. 86-98. [Google Scholar]
- Freifeld A.V., Brod G.N. Designing of an overhead contact system. “Transport”, Moscow, 1991. [Google Scholar]
- Lesov K.S., Mavlanov A.Kh. & Kenjaliyev M.K. Load-Bearing Capacity of Pile Foundations of Contact Network Supports in the Sandy Soil Subgrade. AIP Conference Proceedings, 2022, no. 2432, pp. 030027, DOI: 10.1063/5.0089622. [CrossRef] [Google Scholar]
- Lesov K., Kenjaliyev M., Mavlanov A. & Tadjibaev Sh. Stability of the embankment of fine sand reinforced with geosynthetic materials. E3S Web of Conferences, 2021, no. 264, pp. 02011, https://doi.org/10.1051/e3sconf/202126402011. [CrossRef] [EDP Sciences] [Google Scholar]
- Kryukov E.P., Zavriev K.S., Shpiro G.S. Research of bearing capacity of foundations of contact network supports. Works of CentralNIIS, 1960, Issue 39. Moscow: “Transzheldorizdat”, 216 p. [Google Scholar]
- Sulzberger G. Report on the testing of the foundations of overhead line support structures at Gösgen. Bulletin of the Swiss Electrotechnical Association, 1924, no. 5, pp. 7. [Google Scholar]
- ShNK 2.02.03-13 Pile foundations. Goskomarhitektstroy RUz. Tashkent, 2013. [Google Scholar]
- Znamensky V.V., Znamenskaya E.P., Chunyuk D.Y., Khaliullina D.R. On the assessment of the bearing capacity of driven reinforced concrete piles of standard sections on the horizontal load. // Bulletin of the Perm National Research Polytechnic University. Construction and architecture. 2018, no. 1, pp. 60-69. [CrossRef] [Google Scholar]
- Zaprudsky A.A. Determination of loads on the supporting structures of contact network taking into account the deformation of poles. Proceedings of Transsib, 2011, vol. 3, no. 7, pp. 89-99. [Google Scholar]
- Lesov K.S. & Kenjaliyev M.K. Organizational and Technological Parameters During the Construction of the Bukhara-Misken Railway Line. AIP Conference Proceedings, 2022, no. 2432, pp. 030026. DOI: 10.1063/5.0089621. [CrossRef] [Google Scholar]
- Lesov K.S., Mavlanov A.Kh., Ergashev U.E. Determination of bearing capacity of bases of contact network railroad supports and vertical force acting on bases. Bulletin of TashIIT, 2018, no. 4. pp. 17-24. [Google Scholar]
- Khalfin G.-A. & Umarov K. The work of intermediate rail fasteners on mountain sections of railways. AIP Conference Proceedings, 2023, no. 2612, pp. 040023. https://doi.org/10.1063/5.0126396. [CrossRef] [Google Scholar]
- Muzaffarova M. & Mirakhmedov M. Differences and commonalities impregnation of dry and wet sand. Transport Problems, 2014, vol. 9, no. 3, pp. 91-97. [Google Scholar]
- Muzaffarova M. & Mirakhmedov M. Prospects fixation drift sands physicochemical method. Transport Problems, 2016, vol. 11, no. 3, pp. 143-152, https://doi.org/10.20858/tp.2016.11.3.14. [Google Scholar]
- Ibadullaev A., Teshabayeva E., Kakharov B. & Babaev A. Elastomeric materials based on new ingredients. AIP Conference Proceedings, 2022, vol. 2432 no. 1, pp. 030021. https://doi.org/10.1063/5.0089726. [CrossRef] [Google Scholar]
- Shaumarov S., Kandakhorov S. & Umarov K. Development of the optimal composition of aerated concrete materials on the basis of industrial waste. AIP Conference Proceedings, 2022, no. 2432, pp. 030087, DOI: 10.1063/5.0089875. [CrossRef] [Google Scholar]
- Abdujabarov A., Begmatov P., Eshonov F., Mekhmonov M. & Khamidov M. Influence of the train load on the stability of the subgrade at the speed of movement. E3S Web of Conferences, 2021, no. 264, pp. 02019, https://doi.org/10.1051/e3sconf/202126402019. [CrossRef] [EDP Sciences] [Google Scholar]
- Abdujabarov A., Mekhmonov M. & Eshonov F. Design for reducing seismic and vibrodynamic forces on the shore support. AIP Conference Proceedings, 2022, no. 2432, pp. 030003, https://doi.org/https://doi.org/10.1063/5.0089531. [CrossRef] [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.