Open Access
Issue
E3S Web Conf.
Volume 427, 2023
International Conference on Geotechnical Engineering and Energetic-Iraq (ICGEE 2023)
Article Number 04007
Number of page(s) 9
Section Environment and Infrastructures
DOI https://doi.org/10.1051/e3sconf/202342704007
Published online 13 September 2023
  1. Fadhil G.A., Burhan A.M.. Developing Crisis Management System for Construction Projects in Iraq. Journal of Engineering. 2022 Jan 1; 28(1): 33–51. [CrossRef] [Google Scholar]
  2. Zhang, C., Zayed, T., Hijazi, W., Alkass S. Quantitative Assessment of Building Constructability Using BIM and 4D Simulation. Open Journal of Civil Engineering. 2016 Jun 9; 6(3): 442–461. [CrossRef] [Google Scholar]
  3. Khan S. Constructability a Tool for Project Management. Taylor & Francis Group, Boca Raton. 2019. [Google Scholar]
  4. Ahmed, A., Altaie M. Investigation the Opportunity of BIM With Agile Management Approach in Iraqi Construction Projects. Second International Conference on Geotechnical Engineering – Iraq. 2021. [Google Scholar]
  5. Ibraheem R.A., Mahjoob A.M.. Facilitating Claims Settlement Using Building Information Modeling in the School Building Projects. Innov. Infrastruct. Solut. 2022; 7(40). [CrossRef] [Google Scholar]
  6. Rezouki S.E., Alhilli H.K.. The Causes Influencing the Occurrence of Variation Orders in the Construction of Buildings. Journal of Engineering. 2022 Aug 1; 27(8). [Google Scholar]
  7. Tauriainen, M., Mero, A., Lemström, A., Puttonen, J., Saari A. The Development of Constructability Using BIM as an Intensifying Technology. Taylor & Francis Group, Finland, Aalto University, Espoo. 2012. [Google Scholar]
  8. Yang, H., Lee, M., Siao, F., Lin Y. Use of BIM for Construtability Analysis in Construction. Proceedings of the Thirteenth East Asia-Pacific Conference on Structural Engineering and Construction (EASEC-13). 2013. [Google Scholar]
  9. Mahjoob A M. Achieving the Benefits and Requirements of Integrated Project Delivery Method Using BIM. IOP Conference Series Materials Science and Engineering. 2020 Sept; 901(1). [Google Scholar]
  10. Mahjoob A.M.. Using BIM for Optimizing the Upgrading Cost to Convert the Traditional Buildings to Sustainable Buildings in Iraq. IOP Conference Series Materials Science and Engineering. 2020; 901(1). [Google Scholar]
  11. Erzaij, R., Obaid A. Application of Building Information Modeling (3d and 4d) in Construction Sector in Iraq. Journal of Engineering, 2017; 23(10): 30–43. [CrossRef] [Google Scholar]
  12. Thirion C. Introduction to Constructability and Constuctability Programmes. Owner Team Consultation. 2019. [Google Scholar]
  13. Noaman, A., Rezoqi S.E. An Applying the Delphi Technique for Eliciting Criteria in Equipment and Materials Used in Highway Construction Projects. Journal of Engineering. 2022; 28(7), 43–53. [CrossRef] [Google Scholar]
  14. Shash, A., Almufadhi S. Constructability: Owners, Designers, and Contractors Practices in Industrial Projects. Journal of Engineering, Project, and Production Management. 2021; 11 (3): 169–180. [Google Scholar]
  15. Hijazi, W., Alkass, S., Zayed T. Constructability Assessment Platform Using Customized DIM and 4D Models. AACE international transactions. 2009. [Google Scholar]
  16. Pocock, J., Kuennen, S., Gambatese, J., Rauschkolb J. Constructability State of Practice Report. Journal of Construction Engineering and Management, ASCE. 2006; 132: 373–383. [CrossRef] [Google Scholar]
  17. Zolfagharian, S., Irizarry J. Constructability Assessment Model for Commercial Building Designs in The United States. American Society of Civil Engineers. 2017; 143(8). [Google Scholar]
  18. Tauriainen, M., Puttonen, J., Saari A. The Assessment of Constructability: BIM Cases. Journal of Information Technology in Construction (ITcon). 2015; 20: 51–67. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.