Open Access
Issue
E3S Web of Conf.
Volume 458, 2023
International Scientific Conference Energy Management of Municipal Facilities and Environmental Technologies (EMMFT-2023)
Article Number 03016
Number of page(s) 7
Section Low Carbon Mobility and Logistics
DOI https://doi.org/10.1051/e3sconf/202345803016
Published online 07 December 2023
  1. D.O. Radjibaev, D.M. Insapov, Sh.N. Kahramonov, Analysis of Traction Perfomance of the Ermak Electric Locomotive (3ES5K) in the Angren-Pap Mountain Section, AIP Conf. Proc. (2023) DOI: 10.1063/5.0113235 [Google Scholar]
  2. D.O. Rajibaev, Application of electric locomotives with four-quadrant converter on the railroads of Uzbekistan (thesis abstract) (St. Petersburg State University of Railway Transport, 2011) [Google Scholar]
  3. D.O. Rajibayev, O.K. Jalgasov, T.M. Mahmasalaev, Analysis of on-board diagnostic system actions of O'Z-Y series electric locomotives when malfunctions occur (Universum: Technical Sciences, 24-26, 2021) [Google Scholar]
  4. T.M. Mahmasalaev, D.O. Rajibaev, O.K. Zhalgasov, Young Scientist 8, 350, 8-12 (2021) [Google Scholar]
  5. R. Li, X. Zhao, J. Wang, X. Li, IEEE Access 8 (2020), doi https://doi.org/10.1109/ACCESS.2020.3035092 [Google Scholar]
  6. A.D. Femine, D. Gallo, D. Giordano, C. Landi, M. Luiso, D. Signorino, IEEE Transactions on Instrumentation and Measurement 69(5) (2020), doi https://doi.org/10.1109/TIM.2020.2967162 [Google Scholar]
  7. K. Song, G. Konstantinou, W. Mingli, P. Acuna, R.P. Aguilera, V.G. Agelidis, IEEE Transactions on Power Electronics 32(10) (2017) doi https://doi.org/10.1109/TPEL.2016.2636882 [PubMed] [Google Scholar]
  8. T.M. Nazirkhonov, A.Y. Yakushev, I.P. Vikulov, Bulletin of scientific research results 3, 41–63 (2020) doi: https://doi.org/10.20295/2223-9987-2020-3-41-63 [CrossRef] [Google Scholar]
  9. Internet source: Official site of Dalian Locomotive Works: https://www.crrcgc.cc/tj/g9717.aspx [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.