Issue |
E3S Web Conf.
Volume 17, 2017
9th Conference on Interdisciplinary Problems in Environmental Protection and Engineering EKO-DOK 2017
|
|
---|---|---|
Article Number | 00088 | |
Number of page(s) | 8 | |
DOI | https://doi.org/10.1051/e3sconf/20171700088 | |
Published online | 24 May 2017 |
Rate of change in concentration of organic compounds and nutrients in municipal and dairy wastewater treated in full technical SBR scale
Technical University Of Bialystok, Department of Technology in Engineering and Environmental Protection, Wiejska St. 45E, Bialystok 15-351, Poland
* Corresponding author: j.struk@pb.edu.pl
Municipal WWTP often receive the industrial wastewater, including dairy sewage. The problem of sewage treatment from this sector of economy is not completely solved, especially in plants of medium and small milk processing capacity. The aim of the study was to determine the rate of change in organic compounds and nutrients in municipal wastewater with the participation of dairy products during the processing phases of SBR-type reactor in a technical scale. The study was conducted in WWTP in Sokolka. Rate of changes in the concentrations of organic compounds, nitrogen and phosphorus in wastewater during the processing phases of SBR reactor was determined. Presence of dairy sewage (13% volume participation) affected the decrease in the rate of changes in organic compounds concentrations defined as BOD5 during all processing phases of SBR reactor. Significant influence of dairy sewage on rates of change in nitrogen and phosphorus compounds concentrations during filling, aeration, stirring, sedimentation and decantation phases, was found.
© The Authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.