Issue |
E3S Web Conf.
Volume 197, 2020
75th National ATI Congress – #7 Clean Energy for all (ATI 2020)
|
|
---|---|---|
Article Number | 05005 | |
Number of page(s) | 13 | |
Section | Sustainable Mobility | |
DOI | https://doi.org/10.1051/e3sconf/202019705005 | |
Published online | 22 October 2020 |
Feasibility analysis of a hybrid auxiliary power unit for pleasure boats
1
University of Pisa, DESTEC Largo Lucio Lazzarino, 56122 Pisa, PI, Italy
2
Sanlorenzo s.p.a. Viale San Bartolomeo, 362 19126 La Spezia, SP, Italy
* corresponding author: lorenzo.ferrari@unipi.it
To reduce the pollutant emissions in the naval sector, the use of alternative fuels and new power generator systems are both promising solutions. In this study, the feasibility of replacing a pleasure boat Auxiliary Power Unit (APU) with a hybrid solution is studied from the economic and technical points of view. Several power generation technologies and layouts are considered. Many configurations were investigated, from hybrid battery/diesel generator to innovative layouts including fuel cell with onboard Liquified Natural Gas (LNG) reforming for hydrogen production. Since hybrid APUs may yield significant advantages in terms of both environmental and noise pollution, the opportunity of operating the system for several hours without powering up the traditional generators is also considered. For each configuration, CO2 and NOx emissions, purchasing and operating costs, as well as weight and volume, are estimated. Emissions may be reduced up to 20 % and 60 % for CO2 and NOx, respectively, and fuel cost reductions up to 35 % may be achieved.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.