Issue |
E3S Web Conf.
Volume 198, 2020
2020 10th Chinese Geosynthetics Conference & International Symposium on Civil Engineering and Geosynthetics (ISCEG 2020)
|
|
---|---|---|
Article Number | 01051 | |
Number of page(s) | 4 | |
Section | Geosynthetics Applied Design Theory and Method | |
DOI | https://doi.org/10.1051/e3sconf/202019801051 | |
Published online | 26 October 2020 |
Research on capacity configuration method of microgrid considering system cost
1 State Grid Shandong Power Supply Company; State Grid Dongying Power Supply Company Dongying, China
2 State Grid Shandong Power Supply Company; State Grid Dongying Power Supply Company Dongying, China
3 State Grid Shandong Power Supply Company; State Grid Dongying Power Supply Company Dongying, China
4 State Grid Shandong Power Supply Company; State Grid Shandong Electric Power Research Institute Jinan, China
5 State Grid Shandong Power Supply Company; State Grid Dongying Power Supply Company Dongying, China
6 State Grid Shandong Power Supply Company; State Grid Shandong Electric Power Research Institute Jinan, China
a sddyhn19@sohu.com
b dysjc@163.com
c dlwyy@sohu.com
d sddlwdhl@126.com
e dylhh@126.com
f lovexjtulgl@126.com
Microgrid is a new type of power supply structure and will play an important role in ensuring power supply. Because of the high cost of micro grid construction, this is very necessary to determine the lowest capacity configuration and realize the best function configuration, which is an urgent problem in engineering construction. Therefore, this paper first establishes simulation analysis model, puts forward economic optimization model and constraints, and formulates system configuration scheme and construction cost. The results show that the method is feasible and effective. This scheme not only reduces the operation cost of the system, but also provides a reference for the construction of microgrid engineering.
© The Authors, published by EDP Sciences 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.