Issue |
E3S Web Conf.
Volume 258, 2021
Ural Environmental Science Forum “Sustainable Development of Industrial Region” (UESF-2021)
|
|
---|---|---|
Article Number | 09021 | |
Number of page(s) | 9 | |
Section | Energy Efficiency in Construction | |
DOI | https://doi.org/10.1051/e3sconf/202125809021 | |
Published online | 20 May 2021 |
Domestic experience in organization of mobile construction
Moscow State University of Civil Engineering, 26 Yaroslavskoye Shosse, 129377, Mos-cow, Russia
* Corresponding author:aljurgaitis@gmail.com
The stages of formation of the mechanism of mobile construction and its role in solving major economic problems are considered. The article analyzes the effectiveness of mobile units in agricultural and water management, transport construction. The author emphasizes a fundamentally new approach to mobile construction using the complete-block method of construction of buildings and structures. As an example, the author reveals the experience of construction of the Astrakhan gas processing plant, which illustrates the synthesis of mobile methods of work organization and industrial space-planning solutions in the form of large blocks of technological equipment devices and installations. At the same time, specific engineering solutions for the preparatory period of construction, characteristics and composition of the residential settlement built in the process of pioneer development of the territory are given.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.