Research on the construction ventilation scheme of concealed subway station
1 College of Energy Engineering. Xi’an University Of Science And Technology. Xi’an. 710054
2 College of Architecture and Civil Engineering. Xi`an University Of Science And Technology. Xi’an. 710054
*a Corresponding author: zhaojh@xust.edu.cn
b 1366591020@qq.com
With the development of underground transportation, in order to reduce the impact on the surrounding environment and traffic, Hejiaying subway island station adopts the concealed excavation method. During the construction process, considering the construction method, tunnel layout, ventilation requirements, and the construction working face as a multi-conductor cave, more stringent requirements are put forward for the construction ventilation of the tunnel. Through the combination of theoretical calculation and numerical simulation, a ventilation method suitable for the actual construction conditions at the site was developed. After applying the scheme to practice, the feasibility of the scheme was verified through the determination of field data, and the improvement of the construction environment for tunnel personnel was achieved, which has certain reference value for similar projects.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.