Open Access
Issue
E3S Web Conf.
Volume 283, 2021
2021 3rd International Conference on Civil, Architecture and Urban Engineering (ICCAUE 2021)
Article Number 01021
Number of page(s) 4
Section Research on Civil Engineering and Geotechnical Hydrological Structure
DOI https://doi.org/10.1051/e3sconf/202128301021
Published online 07 July 2021
  1. Zhang Heng. Construction ventilation technology of complex network tunnel group[D]. Southwest Jiaotong University. 2013 [Google Scholar]
  2. Xia Enhu. Rapid ventilation technology with small section and multiple pilot tunnels in underground excavated subway stations[J] Shandong Transportation Technology. 2017(01):113–114. [Google Scholar]
  3. Wang Junzhou. Numerical simulation of tunnel construction ventilation based on ANSYS Fluent[J]. Northwest Hydropower. 2018(03):85–90. [Google Scholar]
  4. Xiaoke Chang, Junrui Chai, Jipeng Luo, et. Tunnel ventilation during construction and diffusion of hazardous gases studied by numerical simulations[J]. Building and Environment, 2020, 177. [Google Scholar]
  5. GB 50299-1999. Code for construction and acceptance of metro engineering. 1999 [Google Scholar]
  6. Xie Yongli. Tunnel Engineering[M]. Chongqing University Press. 201501. [Google Scholar]
  7. Huang Xianzhou. Chen Shi. Wei Zhiguo et. Mixed Construction Ventilation of Lancang River Super Long Tunnel. [J] Chinese Journal of Underground Space and Engineering. 2020, 16(S1):353–359+382. [Google Scholar]
  8. Zhou Jian, Zou Yilun, Xu Wanghao, etc. Ventilation scheme design for the exit section of Micangshan Highway Tunnel[J]. Journal of China & Foreign Highway. 2020,40(03):199–204. [Google Scholar]
  9. Ma Deping. et. 3D numerical simulation of construction ventilation effect for underground chamber group of Xiangjiaba Hydropower Station[J]. Yangtze River. 2011,42(01):29–32+53. [Google Scholar]
  10. Zhang Hua, Chen Hao. Design, Implementation and Testing of Ventilation of Extra-long Highway Tunnel[J]. Road Machinery & Construction Mechanization. 2019,36(12):96–101. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.