Open Access
Issue
E3S Web Conf.
Volume 165, 2020
2020 2nd International Conference on Civil Architecture and Energy Science (CAES 2020)
Article Number 04072
Number of page(s) 4
Section Civil, Architectural Engineering
DOI https://doi.org/10.1051/e3sconf/202016504072
Published online 01 May 2020
  1. HongLiang, Y. YiHua, M. (2014) Project management. Zhejiang University Press, Hangzhou. [Google Scholar]
  2. MinXin, H. HuaiJian, L. (2015) Civil Engineering Drafting 4th Edition. Wuhan University of Technology Press, WuHan. [Google Scholar]
  3. Da Li, 2018, Typical applications of BIM in China's construction engineering industry. https://wenku.baidu.com/view/039cd932842458fb770bf78a6529647d27283495.html [Google Scholar]
  4. Liu Chang. (2014) Research on cost management in the whole process of construction project based on BIM. Chongqing University, Chongqing. [Google Scholar]
  5. Congpeijing. (2006) project management. China Construction Industry Press, Beijing. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.