Open Access
Issue
E3S Web Conf.
Volume 209, 2020
ENERGY-21 – Sustainable Development & Smart Management
Article Number 05026
Number of page(s) 4
Section Session 4. Eastern Vector of Russia's Energy Strategy: Current State and Look into the Future
DOI https://doi.org/10.1051/e3sconf/202020905026
Published online 23 November 2020
  1. General Scheme for the Development of the Electric Power Industry until 2020 published in February 22, 2008 № 215-р. [Electronic resource]. – URL: https://zakonbase.ru/content/part/572036 (accessed 25.08.2020) (In Russian). [Google Scholar]
  2. General Scheme for the Development of the Electric Power Industry until 2035 published in February 22, 2008 № 215-р. [Electronic resource]. – URL: https://zakonbase.ru/content/part/572036 (accessed 07.09.2020). (In Russian). [Google Scholar]
  3. N.I. Voropai, A.M. Kler, Yu.D. Kononov, B.G. Saneev, S.M. Senderov, V.A. Stennikov. Methodological Foundations of Strategic Energy Development // Energy Policy, № 3, p. 35-41. (2018) (In Russian). [Google Scholar]
  4. Kononov Yu.D. Ways to Increase the Validity of Long-term Forecasts of Fuel and Energy Industry Development. – Novosibirsk: Science, p. 34-45. (2015) (In Russian). [Google Scholar]
  5. Korneev A.G. Macro-forecast of Electricity Consumption in Russia and its Eastern Regions in the Long Term // Energy Policy, № 1, p. 67-74. (2019) (In Russian). [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.