Open Access
Issue
E3S Web Conf.
Volume 216, 2020
Rudenko International Conference “Methodological problems in reliability study of large energy systems” (RSES 2020)
Article Number 01025
Number of page(s) 6
DOI https://doi.org/10.1051/e3sconf/202021601025
Published online 14 December 2020
  1. Melentiev L.A. Systems research in energy. 2nd ed., Add. Moscow: Nauka, 1983.455 p. (in Russian) [Google Scholar]
  2. CIGRE Working Group 37.10, “Methods for planning under uncertainty – towards flexibility in power system development,” Electra, vol. 161, pp. 143–163, 1995. [Google Scholar]
  3. IEA, “Harnessing variable renewables – a guide to the balancing challenge,” 2011. [Google Scholar]
  4. H. Holttinen, A. Tuohy, M. Milligan, E. Lannoye, V.Silva, S. Müller and L. Söder, “The flexibility workout: managing variable resources and assessing the need for power system modification,” IEEE Power and Energy Magazine, vol. 11, p. 53–62, 2013. [CrossRef] [Google Scholar]
  5. Eurelectric, “Flexibility and Aggregation - Requirements for their interaction in the market,” 2014. [Google Scholar]
  6. European Commission Smart Grids Task Force Expert Group 3 - Regulatory Recommendations for Smart Grids Deployment, “Regulatory Recommendations for the Deployment of Flexibility,” 2015. [Google Scholar]
  7. EPRI, “Electric Power System Flexibility: Challenges and Opportunities,” 2016. [Google Scholar]
  8. ENTSO-E, “ENTSO-E Response to the CEER Public Consultation Guidelines of Good Practice for Flexibility Use at Distribution Level,” 2017. [Google Scholar]
  9. CEDEC, EDSO for smart grids, Eurelectric, GEODE, “Flexibility in the energy transition – A Toolbox for Electricity DSOs,” 2018. [Online]. Available: https://www.edsoforsmartgrids.eu/flexibility-in-the-energy-transition-a-toolbox-for-electricity-dsos/. [Google Scholar]
  10. Council of European Energy Regulators - Distribution Systems Working Group, “Flexibility Use at Distribution Level – A CEER Conclusions Paper, Ref: C18-DS-42-04,” 2018. [Google Scholar]
  11. IEA, “Status of Power System Transformation 2018: Advanced Power Plant Flexibility,” IEA, Paris, 2018. [Google Scholar]
  12. International Renewable Energy Agency (IRENA), “Power System Flexibility for the Energy Transition, Part 1: Overview for policy makers,” IRENA, Abu Dhabi, 2018. [Google Scholar]
  13. IEA, “Status of Power System Transformation 2019: Power system flexibility,” IEA, Paris, 2019. 30 p. [Google Scholar]
  14. IEA and 21CPP. Status of Power System Transformation 2018 – Advanced Power Plant Flexibility, Paris, 2018. [Google Scholar]
  15. IEA (International Energy Agency). China Power System Transformation – Assessing the Benefit of Optimised Operations and Advanced Flexibility Options, Paris, 2019. [Google Scholar]
  16. Hillberg E., e.a. Flexibility needs in the future power system: ISGAN Annex 6 Power T&D Systems, Discussion paper, March 2019. – 47 p. DOI:10.13140/RG.2.2.22580.71047 [Google Scholar]
  17. Voropai N.I., Osak A.B. Electric power systems of the future//Energy Policy, 2014, No. 5. 60–63. (in Russian) [Google Scholar]
  18. Voropai N, Rehtanz C. Flexibility and Resiliency of Electric Power Systems: Analysis of Definitions and Content//EPJ Web of Conferences 217, 01018 (2019), FREPS 2019. 6 p. [Google Scholar]
  19. Voropai N.I., Osak A.B., Senderov S.M., Stennikov V.A. Energy systems as objects of hierarchical modeling//In the book: Hierarchical modeling of energy systems/Ed. N.I. Voropai, V.A. Stennikov; L.A. Melentiev Energy Systems Institute SB RAS. - Novosibirsk: Publishing house “Geo”, 2020. p. 13–29. (in Russian) [Google Scholar]
  20. Distribution Systems Working Group. CEER Paper on DSO Procedures of Procurement of Flexibility. Ref: C19-DS-55-05, 16 July 2020. [Google Scholar]
  21. The Smart Grid – Adapting the Power System to New Challenges, Math H.J. Bollen, 2011. [Google Scholar]
  22. Directive (EU) 2019/944 of the European Parliament and of the Council of 5 June 2019 on common rules for the internal market for electricity. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.