Open Access
Issue
E3S Web Conf.
Volume 218, 2020
2020 International Symposium on Energy, Environmental Science and Engineering (ISEESE 2020)
Article Number 02026
Number of page(s) 5
Section New Energy Development and Energy Sustainable Development Optimization
DOI https://doi.org/10.1051/e3sconf/202021802026
Published online 11 December 2020
  1. Chen Lin. Research on investment decision method of power grid project considering differentiated development demand [D]. North China Electric Power University (2019). [Google Scholar]
  2. Li Meng, Li Xiaodong. Research on investment allocation model of power grid enterprises based on investment capacity [J]. Northeast electric power technology (2016). [Google Scholar]
  3. Zeng lingchi. Research on investment timing optimization of distribution network construction projects based on dynamic programming [D]. North China Electric Power University (2018). [Google Scholar]
  4. Wan Jing, Zhang Wei. Economic analysis of Hubei Power Grid infrastructure projects by function [J]. Hubei electric power (2017). [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.