Open Access
Issue
E3S Web Conf.
Volume 224, 2020
Topical Problems of Agriculture, Civil and Environmental Engineering (TPACEE 2020)
Article Number 03028
Number of page(s) 11
Section Green IT Engineering
DOI https://doi.org/10.1051/e3sconf/202022403028
Published online 23 December 2020
  1. A. B. Goktepe, A. H. Lav, Method for optimizing earthwork considering soil properties in the geometric design of highways. Journal of surveying engineering 130(4), 183–190 (2004) [CrossRef] [Google Scholar]
  2. D. Hirpa W. Hare Y. Lucet Y. Pushak S. Tesfamariam A bi-objective optimization framework for three-dimensional road alignment design. Transportation Research Part C: Emerging Technologies 65, 61–78 (2016) [CrossRef] [Google Scholar]
  3. D. Li M. Lu Automated generation of work breakdown structure and project network model for earthworks project planning: a flow network-based optimization approach Journal of Construction Engineering and Management 143(1), 04016086 (2016) [Google Scholar]
  4. D. Monnet W. Hare Y. Lucet Fast feasibility check of the multi-material vertical alignment problem in road design. Computational Optimization and Applications, 1–22 (2019) [Google Scholar]
  5. M. K. Jha, Criteria-Based Support System for Selecting Highway Alignments, Journal of Transportation. Engineering, ASCE, 129(1), 33–41 (2003) [CrossRef] [Google Scholar]
  6. S. M. Easa, State-of-the-Art of Three-Dimensional Highway Geometric Design. Canadian Journal of Civil Engineering 25, 500–511 (1997) [Google Scholar]
  7. T. F. Fwa, W. T. Chan, Y. P. Sim, Optimal Vertical Alignment Analysis for Highway Design. Journal of Transportation Engineering 5(128), 395–402 (2002) [Google Scholar]
  8. T. F. Fwa, Highway Vertical Alignment Analysis by Dynamic Programming Transportation Research Record 1239, pp. 1–12 (1989) [Google Scholar]
  9. A. B. Goktepe, S. Altun P. Ahmedzade Optimization of vertical alignment of highways utilizing discrete dynamic programming and weighted ground line. Turkish Journal of Engineering and Environmental Sciences 2(33), 105–116 (2009) [Google Scholar]
  10. A. B. Goktepe, A. H. Lav, S. Altun Dynamic Optimization Algorithm for Vertical Alignment of Highways. Mathematical and Computational Applications 3(10), 341–350 (2005) [CrossRef] [Google Scholar]
  11. W. Li H. Pu H. Zhao W. Liu Approach for Optimizing 3D Highway Alignments Based on Two-stage Dynamic Programming. JSW 8(11), 2967–2973 (2013) [Google Scholar]
  12. C. J. Goh, E. P. Chew, T. F. Fwa, Discrete and continuous models for computation of optimal vertical highway alignment. Transportation Research, Part B 6(22), 399–409 (1988) [CrossRef] [Google Scholar]
  13. A. B. Goktepe, A. H. Lav, S. Altun Method for Optimal Vertical Alignment of Highways. Proceedings of the Institution of Civil Engineers 162, 177–188 (2009) [CrossRef] [Google Scholar]
  14. W. L. Hare, S. Hossain Y. Lucet F. Rahman Models and Strategies for Efficiently Determining an Optimal Vertical Alignment of Roads. Computers & Operations Research, 44, 161–173 (2014) [Google Scholar]
  15. M. Parente A. G. Correia, P. Cortez A. Novel Integrated Optimization System for Earthwork Tasks. Transportation Research Procedia 14, 3601–3610 (2016) [CrossRef] [Google Scholar]
  16. A. S. A. Al-Sobky, An Optimization Approach for Highway Vertical Alignment Using the Earthwork Balance Condition. World Applied Sciences Journal 7(29), 884–891 (2014) [Google Scholar]
  17. E. P. Chew, C. J. Goh, T. F. Fwa, Simultaneous optimization of horizontal and vertical alignments for highways. Transportation Research, Part B 5(23B), 315–329 (1989) [CrossRef] [Google Scholar]
  18. S. M. Easa, Selection of Roadway Grades that Minimize Earthwork Cost Using Linear Programming. Transportation Research, Part A 2(22), 121–136 (1988) [CrossRef] [Google Scholar]
  19. W. Hare V. Koch Y Lucet, Models and algorithms to improve earthwork operations in road design using mixed integer linear programming. European Journal of Operational Research 215, 470–480 (2011) [Google Scholar]
  20. W. L. Hare, Y. Lucet F. Rahman A mixed-integer linear programming model to optimize the vertical alignment considering blocks and side-slopes in road construction. European journal of operational research, 241(3), 631–641 (2015) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.